Pay Bill  |  Contact  |  Emergencies  FacebookTwitterLinkedIn

Projects Out to Bid / Requests for Proposals

Denniston Standby Generators

BID OPENING RESULTS:  PDF (see attached PDF)

Bid Opening: May 1, 2020 – 9:00 am
Pre Bid Meeting: If a Contractor wishes to visit the project sites, the Contractor can coordinate a site visit with the District by calling the District's Office at (650) 726-4405
Engineers Estimate: $200,000
Notice to Contractors:  PDF (see attached PDF)
Addendum No. 1:  PDF (see attached PDF)
Addendum No. 2:  PDF (see attached PDF)

Due to the requirements under the State of California COVID-19 protocols, bidders submitting bids shall contact Coastside County Water District, Darin Sturdivan at (650) 554-0007 when ready to deliver a bid envelope. Bidders shall be solely responsible for ensuring receipt of the bid envelope by Coastside County Water District prior to the indicated bid time, including the process of telephone contact and delivery of the bid envelope. Such bids will be opened immediately after they are due and read over a telephone conference call, details of call below.

Dial: +1 (267) 866-0999
Participant Access Code: 6814 58 9038 #

Bid documents consisting of the Contract Forms, Conditions of the Contract, General Requirements, Technical Specifications, and the Contract Drawings are available online by copying and pasting the following link into your web browser or for pickup at Barker Blue, 363 N. Amphlett Blvd., San Mateo, CA 94401, (650) 696-2100.
https://www.barkerblueplanroom.com/jobs/88/details/denniston-standby-generators-project

Print or digital requests/orders can be placed by the bidders email to This email address is being protected from spambots. You need JavaScript enabled to view it.. A non-refundable fee of $135 per set plus tax is required if picked up, or $35 for electronic download. Barker Blue requires a minimum of four hours advanced notice for sets being picked up. Additional charges will apply as determined by Barker Blue for mailing and delivering bid sets. All arrangements for obtaining bid sets shall be made directly with Barker Blue and made payable to Barker Blue. Barker Blue will also be keeping the latest plan holder’s list during the bid process. All bids must be on the prescribed forms.

Denniston Culvert Replacement and Paving Project

BID OPENING RESULTS:  PDF (see attached PDF)

Bid Opening: Friday, April 10, 2020 – 9:00 a.m.
Pre-Bid Meeting: A mandatory Prebid meeting and site walk will be held on Friday 20 March 2020, at 10:00 a.m. local time starting at the office of the Coastside County Water District, 766 Main Street, Half Moon Bay, California 94019, at which time representatives of the District will be available to answer questions. Following the meeting at the District office, a project site visit will be held.
Engineer’s Estimate: $499,000
Notice to Contractors:  PDF (see attached PDF)
Addendum No. 1: PDF (see attached PDF)
Addendum No. 2: PDF (see attached PDF)
Addendum No. 3: PDF (see attached PDF)
Addendum No. 4: PDF (see attached PDF)
Addendum No. 5: PDF (see attached PDF)
Bid Documents:
Bid documents consisting of the Contract Forms, Conditions of the Contract, General Requirements, Technical Specifications, and the Contract Drawings are available online by copying and pasting the following link into your web browser or for pickup at Barker Blue, 363 N. Amphlett Blvd., San Mateo, CA 94401, (650) 696-2100.
https://www.barkerblueplanroom.com/jobs/81/details/denniston-culvert-and-paving-project

Print or digital requests/orders can be placed by the bidders emailing This email address is being protected from spambots. You need JavaScript enabled to view it.. A non-refundable fee of $83 per set plus tax is required if picked up, or $35 for electronic download. Barker Blue requires a minimum of four hours advanced notice for sets being picked up. Additional charges will apply as determined by Barker Blue for mailing and delivering bid sets. All arrangements for obtaining bid sets shall be made directly with Barker Blue and made payable to Barker Blue. Barker Blue will also be keeping the latest plan holder’s list during the bid process. All bids must be on the prescribed forms.